hit tracker
Sunday, May 19, 2024
HomeLatest NewsUrai Main Pipeline Department celebrates 45 years since its foundation - Rossiyskaya...

Urai Main Pipeline Department celebrates 45 years since its foundation – Rossiyskaya Gazeta

Date: May 19, 2024 Time: 08:27:20

One of the oldest structural divisions of the department is LPDS “Shaim”, commissioned in 1969. In December 1965, the first trunk oil pipeline in Western Siberia, Shaim – Tyumen, with a length of 440 km, was put into service and transportation began. of oil from the Shaim field.

General Director of Transneft Siberia Rustem Islamov congratulated the employees of the subsidiary and presented letters of gratitude from the company and the Ministry of Energy of the Russian Federation. “45 years is a serious career, during which a lot has been achieved. The team works harmoniously, responsibly, with full dedication, fulfills all production tasks on time and with adequate quality. Thank you for your conscientious work,” he noted.

Today, the branch is responsible for oil transportation in the Khanty-Mansiysk Autonomous Okrug-Ugra and the Sverdlovsk region. Branch. It serves more than 3.6 thousand kilometers of linear sections of oil pipelines. It includes 4 linear production and dispatch stations and 6 oil pumping stations.

The team continues to ensure safe and uninterrupted oil transportation. The domestic equipment used is characterized by high technology and energy efficiency. Within the framework of the technical re-equipment, overhaul and reconstruction program, 8 main electric pumps and booster units at oil pumping stations were replaced over the past two years. The Shaim LPDS microprocessor automation system was rebuilt. A new reservoir was built with a volume of 20 thousand cubic meters. m and a domestic wastewater treatment plant, which was produced at the Tyumen Mechanical Repair Plant (a structural division of the company). The station is compact and automated, allows you to purify wastewater to a quality that corresponds to the maximum permitted concentration of substances in fishery reservoirs and has higher performance than imported analogues.

In January 2024, at Konda LPDS, after technical re-equipment, an oil quantity measurement system (OCMS) was put into operation. A new oil quality control unit was installed. In addition, the information collection and processing system from a third party manufacturer was replaced with a new one manufactured by Transneft and connected to the technological data transmission system. SIKN aims to determine the indicators of oil quantity and quality when accounting for commercial and commodity transactions with oil.

The systematic replacement of sections of the linear part of the main oil pipelines and power lines is being carried out.

Currently, the team has more than 1.6 thousand people. Branch employees actively participate in the company’s volunteer movement, patriotic and environmental corporate events, regional and city sporting events.

“Special words of gratitude and tribute to the veterans of our department, who actively participated in the formation of the company and prepared a worthy replacement. Today the baton is taken by young specialists who, I am sure, will do it with dignity. We continue our work, strengthening the traditions of the company,” said the head of the branch, Timofey Slepnev.

Press release provided by Transneft Siberia JSC.

* This website provides news content gathered from various internet sources. It is crucial to understand that we are not responsible for the accuracy, completeness, or reliability of the information presented Read More

Hansen Taylor
Hansen Taylor
Hansen Taylor is a full-time editor for ePrimefeed covering sports and movie news.
RELATED ARTICLES

Most Popular

Recent Comments